MSUR: From tender pack to takeoff Skip to content

From tender pack
to takeoff. Faster.

Drop in the drawings and specs from your next tender. MSUR organises the pack, gets you into the measure and carries those quantities into your estimate, variations and site progress.

Your first tender is free. No card required.

01 / Setup

Start with the tender pack. Not an empty project.

Upload the ZIP the client sent over. MSUR identifies drawings, specs, drawing registers and supporting documents, and lays them out as a structured project, before you've measured a thing.

Unsorted · 34 files
0291-04_L001.pdf SK001_Spec.pdf CDM_Analysis.pdf L034B_First_Floor.pdf Building_Regs.pdf …and 29 more
001 · MSUR HQ project
  • ▾ GA Plans20 docs
  • ▾ Spec documents6 docs
  • ▾ Elevations2 docs
  • ▾ Sections1 doc
  • ▾ Schedules2 docs
02 / Scope

MSUR does the reading before you do the measuring.

Legends and specifications point to what needs measuring and how. You review and adjust before anything is confirmed.

Legend identified
  • WG05 Bedroom emulsion
  • DG03 Office feature wall
  • WG07 Bathroom tanking
Spec reference

M60 Painting, Section 3.2

“Emulsion finish, two coats, to all plastered internal wall surfaces unless noted otherwise.”

Suggested measurement
  • WallsLinear × height →
  • CeilingsArea →
  • DoorsCount →

You confirm every suggestion before it becomes a measurement.

03 / Takeoff

Measure on the drawing. Keep the commercial record.

The quantities you measure at tender stay on the job for the estimate, variations and progress.

Typical workflow

Measure in one tool, then retype quantities into spreadsheets, estimates and site records.

MSUR

Same numbers from tender takeoff through estimate, variations and progress. No rebuilding each time.

04 / Estimate

Your takeoff is already your estimate.

Measured quantities land straight in the BOQ. Add rates, finish systems and products. No need to rebuild the estimate in a spreadsheet.

GroupDescriptionMeasuredRateAmount
Bedroom · 2 coats Unit A, Level 1 65.6 m² ←takeoff £8.00/m² £524.80
Office · 1 coat Staff, Level 1 40.7 m² ←takeoff £35.00/m² £1,424.50
Bathroom · tanking Ground floor 20.6 m ←takeoff £22.00/m £453.20
Project total £2,402.50

Ready to send.

Export marked-up drawings and measurement tables for your client or project team.

And it doesn't stop when the job is won.

The measurements created during tendering can continue into variations, progress and applications when you're involved beyond tender.

Tender
Takeoff → Estimate
Win
Delivery
Variations → Progress → Applications
05 / Variations

The drawing changed. Your numbers didn't disappear.

Select the measured walls the instruction affects, omit the original finish and add the replacement. Some variations need new measurements. You decide what to omit and what to add.

Omitted £800.00

Wall finish: Emulsion, White · 100 m² @ £8/m²

Added £1,000.00

Wall finish: Feature, Sage · 100 m² @ £10/m²

Net variation: +£200.00

06 / Progress

Your takeoff becomes your progress record.

Site teams record what's actually been done, against measurements that already exist. Nothing to set up on site.

  1. 1Open drawing
  2. 2Select room
  3. 3Select finish
  4. 4Record stage
Level 02
Walls, mist63%
Walls, finish41%
Ceilings, FNS00378%
07 / Applications

Ready for the next valuation.

Measured quantities plus recorded progress give you the numbers for the next application. You still check them before you send.

Total measured quantity1,000 m²
Previously applied300 m²
This period100 m²
Total completed400 m² · 40%

Try it on a real tender.

Upload the next tender pack you receive and see how MSUR fits your workflow.

No card required. From £49/month after your first tender.